Accelerating the Energy transition
In an ideal world, renewable energies are positioned in the best places
Accelerating the energy transition
By facilitating the development of green energy, both in France and abroad.
Competitively
Through fair remuneration of local stakeholders and the production of competitive electricity for local residents.
Consistent with the local environment
By taking local issues into account and selecting virtuous partners.
Our technology
A dedicated photovoltaic solution.
Our unique technology analyses the entire country, identifying the most suitable sites for a successful photovoltaic project.
Analysis of the whole of France in less than 48 hours
170 million hectares analysed in Europe, more than 3 times the size of France
15,000 plots produced in France, i.e. 300,000 hectares
You are an owner
We take you step by step
STEP 1
Land identification
Your plots are analysed free of charge and we identify the best location for the project.
STEP 2
Contact us
Talk to one of our experts to confirm the validity of the project and explain your expectations.
STEP 3
Site visit
Our local project manager will meet with you to refine your agricultural project and confirm its technical feasibility.
STEP 4
Sales proposal
Within two weeks, you’ll receive a sales proposal tailored to your needs and your project.
You are a solar developer
Access to the best land on the market
Large volume of solar opportunities
Risk assessment using the highest market standards
Exclusive platform for accessing your opportunities
The Inicio key
Explore the potential of your land
Flexibility
Choose between a rental or acquisition process, depending on your needs.
Reliability and expertise
Thanks to our unique algorithm, we identify the most suitable sites for the development of renewable energy combined with the selection of the best developer for the success of the project.
Environment ethics
Sustainable development is at the heart of our approach.
We are committed to minimizing visual and environmental impacts.
Made to measure
Every project we develop is unique. We strive to understand your challenges and needs as fully as possible, so that we can offer you a tailored, personalised service.
Accelerate your energy transition
Frequently asked questions
On average, it takes between 4 and 5 years from the discovery of the land to the launch of the power plant.
This is dʼInicioʼs primary aim, to identify land with the fewest constraints so that this timeframe is as short as possible.
To carry out this type of project, the environmental impact must be controlled. This is why studies are carried out prior to the project. For example, studies are carried out over 4 seasons to measure the potential impact on local flora and fauna. If the impact is too great, the application will not be accepted by the government.
- Land use: Photovoltaic panels are installed on sloping and/or raised structures, occupying part of the land. In the majority of cases, the structures are fixed using piles driven into the ground, without the use of concrete. As a result, there is very little direct impact on the land.
- Modification of the ecosystem: The installation of the panels results in the modification of natural habitats for local flora and fauna. This may be favourable to certain species, and unfavourable to others.
- Umbrella’ effect: Photovoltaic panels reduce the amount of light and rain directly available to the ground beneath the panels, modifying local microclimates. In particular, moisture is retained better under the panels in dry periods.
- Water run-off: Photovoltaic panels can alter rainwater run-off, potentially increasing the risk of erosion or run-off if water management is not optimised. In most cases, solar power plants are installed on flat land, thereby limiting this problem.
- Agricultural land: If the land is fertile, the installation of panels may limit its agricultural use. However, the concept of agrivoltaics (combining agriculture and photovoltaics) tends to minimise this impact by optimising the mixed use of the land. Photovoltaic projects are now authorised on farmland only if they provide at least one of the following 4 services: improved agronomic potential, adaptation to climate change, protection against climatic hazards, improved animal welfare, etc.
Do you have
any other questions?
About us
Our team dedicated to your project.
We believe that the alliance of Tech and People is the key to solving the major challenges of the future.
News
At Inicio we built Eywa, an algorithm that can find the best solar power plant location, using billions of geographical data points.
Context Inicio’s promise is to identify the best locations for solar power plants using Eywa, our in-house algorithm. While there is an
The press is talking about us
Inicio Blog
They’re committed to us